+1 (959) 777-7390

Engineering Services

  • Modeling (Creo, Solid works…..)
  • FEA Tools (Ansys, FlowTHERM…..)
  • Product design
  • Reverse Engineering
  • Embedded Engineering Solution

Design Process

  • Customised Solution
  • Lean Design
  • Use of latest technologies
  • Green approach Reuse, recycle & footprint
  • Monitoring and Control automated system
  • Quality check - Peer reviews
  • Start-up and commissioning
  • Facility Maintenance support

Mechanical Design Services

  • Heat load calculation
  • Equipment Layout Design
  • Project Management
  • Piping Design
  • Ventilation System
  • Control Systems
  • Air distribution System

Electrical Design Services

  • HT/LT Power Distribution
  • Equipment Layout Design
  • Reserve Power calculation
  • Cable/Bus raiser systems
  • Control Systems Design
  • Earthing/Lightning Protection/Surge Protection
  • Complete steel Power house modelling
  • Lighting layout

Data center Solutions

We offer following Services for the Data centres
  • Complete Design of state-of-the-art power Distribution system
  • Engineering Project Management
  • MEP Design Support
  • Redundant architecture automation & controls design
  • Supply, Installation, modification, upgradation of existing PLC/SCADA Automation Systems
  • Factory witness tests & system level Reviews
  • Key Documents creation : SOO, Test Matrix, MOP’s and O &M/li>
  • Startup and commissioning onsite support –Level 3, 4 & 5 commissioning support

Power Distribution Automation

An Integrated Power Distribution Approach to Operational Efficiency & Reliability provides prescriptive measures for better data collection, integration, and change management practices throughout the entire facility lifecycle
  • Lists and defines required operational documents for turnover to Facility Operations team
  • Recommends employing a commissioning consultant from schematic design phase through ‘Go Live’ turnover
  • Presents a formulated approach for producing a holistic facility sequence of operations manual that is delivered to the Facility Operations team at turnover
  • Defines and outlines Sequence of Operations format